Railroad Line Forums - Tellynott corner module
Railroad Line Forums
Username:
Password:
Save Password


Register
Forgot Password?
  Home   Forums   Events Calendar   Sponsors   Support the RRLine   Guestbook   FAQ     Register
Active Topics | Active Polls | Resources | Members | Online Users | Live Chat | Avatar Legend | Search | Statistics
Photo Album | File Lister | File Library
[ Active Members: 5 | Anonymous Members: 0 | Guests: 189 ]  [ Total: 194 ]  [ Newest Member: motors ]
 All Forums
 Model Railroad Forums
 Mike Chambers' Craftsman's Corner
 Tellynott corner module
Previous Page | Next Page
 New Topic |   New Poll New Poll |   Reply to Topic | 
Author Previous Topic: Brets Brewery (CSM) Construction Thead Topic Next Topic: scratch building the idaho hotel in o scale
Page: of 45

mark_dalrymple
Fireman

Posted - 09/13/2020 :  4:34:05 PM  Show Profile  Send mark_dalrymple an AOL message  Reply with Quote
quote:
Fabulous work, Mark, but I hope Harry and Graham are Reeeeeeeaalllyyyy Careful with those weeds, as the Fire Marshal will not be at all pleased if he has to stop by to sift through the ashes of that magnificent enterprise!


Thanks very much, Pete! Yes - very careful. Actually, the sand flies at the site of the prototype whitebait factory we so bad that much of the work was done at night under candle light!

Cheers, Mark.



Country: New Zealand | Posts: 1230 Go to Top of Page

mark_dalrymple
Fireman

Posted - 09/13/2020 :  4:36:12 PM  Show Profile  Send mark_dalrymple an AOL message  Reply with Quote
quote:
All the decking, steps, railings and other details really look good and add a lot of character to the building.


Thanks, George.

They are fiddly and take a while to do, but I agree they add a lot of character. I don't think I would want to do them all at once!

Cheers, Mark.



Country: New Zealand | Posts: 1230 Go to Top of Page

mark_dalrymple
Fireman

Posted - 09/13/2020 :  4:37:39 PM  Show Profile  Send mark_dalrymple an AOL message  Reply with Quote
quote:
Mark what outstanding work and the view for the workers!!


Thanks Jerry.

They don't know how lucky they are!

Cheers, Mark.



Country: New Zealand | Posts: 1230 Go to Top of Page

mark_dalrymple
Fireman

Posted - 09/13/2020 :  4:39:24 PM  Show Profile  Send mark_dalrymple an AOL message  Reply with Quote
quote:
Looking good Mark. Lots of interesting details at catching angles.


Thanks, Bob.

Yes - all those angles and elevation changes take a lot of working out, but I think it is worth it.

Cheers, Mark.



Country: New Zealand | Posts: 1230 Go to Top of Page

mark_dalrymple
Fireman

Posted - 09/13/2020 :  4:41:23 PM  Show Profile  Send mark_dalrymple an AOL message  Reply with Quote
quote:
Fantastic plan and execution! Bravo Mark!


Thanks, Carl!

Its been a fun ride. Easily the longest I have spent on a single model. I am pleased with my perseverance though.

Cheers, Mark.



Country: New Zealand | Posts: 1230 Go to Top of Page

mark_dalrymple
Fireman

Posted - 09/13/2020 :  4:44:03 PM  Show Profile  Send mark_dalrymple an AOL message  Reply with Quote
quote:
Excellent work, Mark. I find your increasingly complex cannery very intriguing.


Thanks, Michael.

There is still a ways to go, but I feel the end is in sight! I think I will definitely tackle a simpler project next - maybe one of the DPM kit-bashes.

Cheers, Mark.



Country: New Zealand | Posts: 1230 Go to Top of Page

mark_dalrymple
Fireman

Posted - 09/13/2020 :  4:47:31 PM  Show Profile  Send mark_dalrymple an AOL message  Reply with Quote
quote:
A building worthy of a lot of study. I keep looking back at the pictures to enjoy the complexity of the building, Wonderful job!!


Thanks so much, David.

I think the open walkway will add a lot. It should also frame nice views of the longitudinal view to the corner module.

Cheers, Mark.



Edited by - mark_dalrymple on 09/13/2020 4:49:16 PM

Country: New Zealand | Posts: 1230 Go to Top of Page

mark_dalrymple
Fireman

Posted - 09/13/2020 :  4:48:40 PM  Show Profile  Send mark_dalrymple an AOL message  Reply with Quote
quote:
Fantastic!


Thanks, Frank!

Cheers, Mark.



Country: New Zealand | Posts: 1230 Go to Top of Page

mark_dalrymple
Fireman

Posted - 09/13/2020 :  4:53:01 PM  Show Profile  Send mark_dalrymple an AOL message  Reply with Quote
I must get outside to do some chores, but will post an update tonight.

More soon, cheers, Mark.



Country: New Zealand | Posts: 1230 Go to Top of Page

mark_dalrymple
Fireman

Posted - 09/14/2020 :  02:53:05 AM  Show Profile  Send mark_dalrymple an AOL message  Reply with Quote
Hi guys.

I have 20 minutes so I'll see if I can get things up to date.

Photo 1 - shows the hole I carefully cut into the side of the structure. This is the opening for the doors from the open elevated walkway into the cannery.


Photo 2 - shows the new scratch-built doors framed and in positions. Again I used nut-bolt-washer castings painted brass as door handles. These doors will connect the open walk-over to the main structure.


Photo 3 - shows the base of the cupola assembled and a small plastic roof piece. You can see I filed a bevel on to the roof. There is a small gable topnotch to go in the center.


Photo 4 - shows the walls of the topnotch. I had to very carefully cut out timber for the louvers. None of my chisel blades were small enough so I used a number 11 blade. The side walls are 8mm high.


Photo 5 - shows the double doors attached and hanging in their tracks. I drilled holes in the ends of the pelmets and added nut-bolt-washer castings to attach them to the wall. You can also see the finger hole in the railings (I managed to trim the 4x2's back to half on a post, so repair shouldn't be too bad.


More soon, cheers, Mark.



Country: New Zealand | Posts: 1230 Go to Top of Page

mark_dalrymple
Fireman

Posted - 09/14/2020 :  03:05:34 AM  Show Profile  Send mark_dalrymple an AOL message  Reply with Quote
Next was to assemble the copula. There was a lot of work in this little addition. I have a couple of touch ups to do. I put the tape on the beveled roof, mitering the corners, cut a square slightly smaller than the top notch, and then peeled back the edges. After the top notch was glued in position I used a toothpick to push the tape into the bottom edges of the top notch as a flashing.




As an aside I bought my first ebay purchase since COVID19 hit. My wife has been asking me what I want for my birthday. I've been looking at Sheepscot's Arcadia granite on ebay and talking myself out of it (the price, such a big kit it might overpower my mountain scenery, I already have the lime works to build, etc). Today a saw FSM's rock bunker for a good price and decent international shipping so I thought 'why not'. This kit has always been one of my favourites, and one of the few FSM kits I think I could find room for now. It will also be able to be tucked into the mountain side as a bit of a surprise without dominating the scene.

Onto the cannery progress.

I went with grey tar paper for the second story roof, and will do black for the first story. I had to add some 8"x8" in white to the bottom of the cupola to get things to sit right. My flashings hid most of this, but it looks intentional anyway. I chiseled the side wall where the cupola fits up against to get a nice fit and glued it into place. I had put the roofing material on first, trimmed it around where the cupola sits, and peeled the edges up. When the glue was set I pushed it into the edges with a toothpick. Three coals of slate grey were applied followed by a dry-brushing with unbleached titanium. Weathering with chalks is still to be done. I made a stack from some styrene pipe. I wrapped a piece of thin strip styrene around it to simulate a join. I cut a small slither of larger diameter pipe, glued this to some thin styrene, trimmed the excess away and sanded the edges to make a cap. I painted these in grey followed by unbleached titanium using the dry sock method. I cut a circle of high tack painters tape about 4mm larger in diameter than the stack, cut a smaller circle in the center, and cut a bunch of nicks heading for the center of the circle. I cut one all the way through and using tweezers and a toothpick was able to maneuver this around the stack to form a flashing with the flaps folded up the side. I then cut a thin strip of painters tape and wrapped this around to hide the nicks. This was then painted grey. I have also started work on the elevated water tank and support tower (photo 4) which will sit against the structure. I have heightened the stand slightly from my original plans so that the tower decking will hide the seem of the first and second story meeting. It will also give me slightly more head room for pedestrian traffic below. There is a change in level here and a set of stairs between them - hence the two shorter legs.









More soon, cheers, Mark.



Country: New Zealand | Posts: 1230 Go to Top of Page

Michael Hohn
Fireman



Posted - 09/14/2020 :  09:29:48 AM  Show Profile  Visit Michael Hohn's Homepage  Reply with Quote
Just keeps getting better, Mark. The cupola tops it off nicely.

It will be interesting watching you build a kit.

Mike



Country: USA | Posts: 6610 Go to Top of Page

Carl B
Fireman

Premium Member

Posted - 09/14/2020 :  09:33:25 AM  Show Profile  Reply with Quote
Extremely well done Mark.


Country: USA | Posts: 3920 Go to Top of Page

Frank Palmer
Fireman



Posted - 09/14/2020 :  09:37:06 AM  Show Profile  Visit Frank Palmer's Homepage  Reply with Quote


Mark, that set of buildings has a ton of character. Well done mate.


Frank

Country: USA | Posts: 5932 Go to Top of Page

mark_dalrymple
Fireman

Posted - 09/14/2020 :  3:21:32 PM  Show Profile  Send mark_dalrymple an AOL message  Reply with Quote
Hi guys.

Thanks so much Michael, Carl and Frank!

I got a bit more done on the water tank and support tower. So after grovelling around in the garage looking for a suitable former for my tank I settled on a spare broom handle. I cut a piece to length in my mitre saw. I cut lengths of 6"x1" a little longer than the tank former and gave them a stain bath. I marked vertical center lines and a center line down the tank former top and glued the pieces on the end. I went half way, trimmed them off, and then used the off-cuts for the other half. When the glue was dry I used a single edged razor blade to trim them flush with the edge of the former.

Photo 1 - shows the first end glued onto the former.


Once I had done both ends I glued the strips of 6"x2" around the circumference of the former. The last piece was ripped to fit.

Photo 2 - shows the 6"x2" glued around the outside of the former.


I then carried on with the stand. I put in horizontal bracing to line up the legs, inside and outside the posts on the front and one side. I then added diagonal bracing.

Photo 3 - shows the bracing attached and the tank sitting in position.


I cut 4"x4" posts and cut rebates in the ends of the ones for the long wall, down to 4"x2"s to fit over the outside joist. The posts were glued into position. I then cut decking from 12"x2" and glued this on, checking the decking around the posts where necessary.

Photo 4 - show the posts in position.


I cut a piece of high tack painters tape to slightly longer than the circumference of the tank and taped it to my cutting board. I marked and cut strips to represent tank bands. I painted the tape a rust colour, marked five positions on the tank at four equal spacing's around the circumference, carefully peeled the strips off (when dry) and attached them around the tank. I put the joins at the bottom. For the ends of the tank I used 3 pieces of stripwood.

I also put the 4"x2" railings around the tank platform. I then cut a circle of thin styrene the same diameter as the tank, removed the center, and drew a square around the circle about 3mm bigger than the circle. I then cut these into four equal arcs with a flat bottom and sandwiched two pairs together with a piece of square strip in the middle to create tank cradles. These I painted cool grey and glued to the bottom of the tank.




More soon, cheers, Mark.



Edited by - mark_dalrymple on 09/14/2020 3:26:19 PM

Country: New Zealand | Posts: 1230 Go to Top of Page
Page: of 45 Previous Topic: Brets Brewery (CSM) Construction Thead Topic Next Topic: scratch building the idaho hotel in o scale  
 New Topic |   New Poll New Poll |   Reply to Topic | 
Previous Page | Next Page
Jump To:
Railroad Line Forums © 2000-2020 Railroad Line Co. Go To Top Of Page
Steam was generated in 0.97 seconds. Powered By: Snitz Forums 2000