My layout doesn't have much hidden track, and only one out of sight turnout. When I'm running by myself I can either see the points or see a control lever that shows the position of the one I can't see. But my guest operators sometimes lack that local knowledge, or maybe the vision.

I've been thinking about signals ever since I got the basic control system working. This shows my guess of how B&M practice would have been applied to my Bexley Tower interlocking (the lower right corner of the track plan image):


I've been thinking about signals ever since I got the basic control system working. This shows my guess of how B&M practice would have been applied to my Bexley Tower interlocking (the lower right corner of the track plan image):

Comment