Next I needed to make a place for the station. I had the base already made. So I just framed the base with 3/4" Luan. The frame will allow me to bring the ground cover right up the the edge of the base while allowing it to be removed if needed...
Well I have gotten alot of work done since my last post on the layout. I have applied the Home made Sculpt a Mold around the station. I have not added any zip texturing or dirt yet. waiting to do that all at once.
Its hard to believe it has been 2 months since my last post. I have done a few small things but have really been busy with family stuff. As always my wife is in Nicaragua for 2 week on a mission trip.
I always take that time off to get some things I want to do around the shop. I have been working on the ground cover around the peninsula. Getting some buildings in place and getting some basic ground cover in place....
I have 15 more days to go. I have actually glued the main part together and hopefully start work on it soon. I have also glued stringer around the edges of the building so it can be removed if needed and also bring the ground cover up to it...
I was planning on getting most of the ground cover down for the next 2 weeks. So the next thing i need to do was to work on the area around the turntable. I figured out the width of the walkway. I laid stringers to lay the planks on the flat area.
Comment