Well, work has stopped on the above build whilst I thaw out the Mrs[:-angel].Due to the weather conditions,her work sent all staff home early - it took her over 2 hours to get out of a gridlocked Leeds and just 30 minutes to drive the remaining 12 miles down the motorway.
Below are 2 photos of work in progress.....
1st up, over view of the build.

Secondly, side view of loco showing how the modified Backwoods Miniatures 2-8-0 Conversion oil bunker fits - room enough under there for a trailing truck. Bunker needs tidying up with some frame work where the bunker floor joins up to the loco.

Cheers
David
Download Attachment:
Mogul-side-tank-2.jpg
97.47 KB
Download Attachment:
Mogul-Side-tank.jpg
72.73 KB
Below are 2 photos of work in progress.....
1st up, over view of the build.

Secondly, side view of loco showing how the modified Backwoods Miniatures 2-8-0 Conversion oil bunker fits - room enough under there for a trailing truck. Bunker needs tidying up with some frame work where the bunker floor joins up to the loco.

Cheers
David
Download Attachment:

97.47 KB
Download Attachment:

72.73 KB
Comment