Railroad Line Forums - BCRR
Railroad Line Forums
Username:
Password:
Save Password


Register
Forgot Password?
  Home   Forums   Events Calendar   Sponsors   Support the RRLine   Guestbook   FAQ     Register
Active Topics | Active Polls | Resources | Members | Online Users | Live Chat | Avatar Legend | Search | Statistics
Photo Album | File Lister | File Library
[ Active Members: 0 | Anonymous Members: 0 | Guests: 186 ]  [ Total: 186 ]  [ Newest Member: mike mientus ]
 All Forums
 Model Railroad Forums
 The On30 Line
 BCRR
Previous Page | Next Page
 New Topic |   New Poll New Poll |   Reply to Topic | 
Author Previous Topic: J.D.s Machine Shop Topic Next Topic: R. T. HARDING MINING CO.
Page: of 11

brownbr
Fireman

Premium Member

Posted - 01/28/2021 :  07:02:54 AM  Show Profile  Reply with Quote
The scenery is fantastic


Country: USA | Posts: 1546 Go to Top of Page

Michael Hohn
Fireman



Posted - 01/28/2021 :  08:26:22 AM  Show Profile  Visit Michael Hohn's Homepage  Reply with Quote
Kyle,

Youĺre a dab hand at making rocks from styrofoam. Impressive.

Mike



Country: USA | Posts: 7475 Go to Top of Page

Tyson Rayles
Moderator

Premium Member


Posted - 01/28/2021 :  10:12:02 AM  Show Profile  Reply with Quote
Rock on Kyle!


Country: USA | Posts: 13457 Go to Top of Page

kyle creel
Engine Wiper



Posted - 01/29/2021 :  01:08:31 AM  Show Profile  Reply with Quote
Thanx Rick,
Thanx Larry,
Thanx Brian,
Thanx Michael,
Thanx Tyson.

OK... more 'strocks'; this time I concentrated on filling in some areas with smaller outcroppings that had a little less depth. Most were carved from 3/4" thick styrofoam, which made it very interesting as I was carving the pieces with a sharp serrated knife while holding them in the palm of my hand. I also moved over to the other side of the chasm and began adding some there. There's a couple of shots of the white 'strocks' before adding some paint. Also remember that the entire cliff face, 'strocks' especially, will get a coat of plaster to seal them, and to provide a fresh surface for final coloring.

Download Attachment: kcrsd.jpg
165.08áKB


Download Attachment: 004kcrsd.jpg
139.96áKB


Download Attachment: 012kcrsd.jpg
152.11áKB


Download Attachment: 007kcrsd.jpg
196.99áKB


Download Attachment: 013kcrsd.jpg
184.52áKB


Download Attachment: 015kcrsd.jpg
162.81áKB



Edited by - kyle creel on 01/29/2021 01:27:53 AM

Country: USA | Posts: 477 Go to Top of Page

kyle creel
Engine Wiper



Posted - 01/29/2021 :  01:34:05 AM  Show Profile  Reply with Quote
The last 2 pictures are similar however the second one is a little closer in. I think when it's all done I'll try to post some older shots to show before and after.

Thanx for stopping by, and all the comments are so very much welcomed and appreciated; Ya'll take care...

KYLE CREEL
Supt./G.M. BCRR



Country: USA | Posts: 477 Go to Top of Page

kyle creel
Engine Wiper



Posted - 02/01/2021 :  12:13:43 AM  Show Profile  Reply with Quote
Allright, the rock face is done. Next up is the plaster/sand/color mix to fill in around the edges of the pieces that have been added where needed. Then a coat of the same mix only much thinner will be applied to the surfaces of the 'strocks' to seal the styrofoam and get rid of and fill in around any pesky little 'styro balls' on any of the rock surfaces. After that, the final coat of color and washes and we're done and ready to move on to the next project...hope you like the progress so far...

Download Attachment: 022kcrsd.jpg
175.27áKB


Download Attachment: 027kcrsd.jpg
199.33áKB

Download Attachment: 029kcrsd.jpg
126.39áKB
http://www.railroad-
line.com/forum/data/kyle%20creel/20212101815_029kcrsd.jpg[/img


I'm thinking about painting the steel arch span in the first shot silver w/weathering and a bit of rust?

Kyle Creel
Supt./G.M. BCRR



Edited by - kyle creel on 02/01/2021 12:29:51 AM

Country: USA | Posts: 477 Go to Top of Page

Rick
Administrator

Premium Member


Posted - 02/01/2021 :  04:00:34 AM  Show Profile  Reply with Quote
Nice looking rocks.


Country: USA | Posts: 24510 Go to Top of Page

TRAINS1941
Engineer

Premium Member


Posted - 02/01/2021 :  08:03:01 AM  Show Profile  Reply with Quote
Nice job Kyle.

Jerry

"And in the end, it's not the years in your life that count. It's the life in your years." A. Lincoln

Country: USA | Posts: 13384 Go to Top of Page

Larryc
Crew Chief



Posted - 02/01/2021 :  11:08:57 AM  Show Profile  Reply with Quote
Kyle great job on the rock faces!! They look very real and your eye for color is fantastic. Did you happen to take a "finger count" when you were done carving the foam? Just curious.


Country: USA | Posts: 890 Go to Top of Page

kyle creel
Engine Wiper



Posted - 02/01/2021 :  2:14:58 PM  Show Profile  Reply with Quote
Thanx Rick,
Thanx Jerry,
Thanx Larry,
I sure do appreciate all the comments; here's something I whipped out this morning. I started about 9:15AMcst and finished at 12:30, then took some shots. As you can hopefully tell I added narrow gauge rails to one of the standard gauge sidings making it dual gauge. This gives me one extra On30 siding without giving up a std. gauge siding: or having that strange looking 'LIONEL' effect of just adding a third rail. I'll cut the flangeways for the std. gauge wheels once I start adding guard rails and fine tuning it..so far it works fine and my back says 'enough already'!!

Kyle Creel
Supt./G.M. BCRR

Download Attachment: 001kcrsd.jpg
114.72áKB


Download Attachment: 003kcrsd.jpg
97.63áKB


Download Attachment: 004kcrsd.jpg
99.44áKB



Edited by - kyle creel on 02/01/2021 2:19:54 PM

Country: USA | Posts: 477 Go to Top of Page

kyle creel
Engine Wiper



Posted - 02/27/2021 :  09:50:36 AM  Show Profile  Reply with Quote
I'm going to disconnect the 4x8 center section of the railroad, lower it by 3 1/2" and rotate it 180*. This will re route the main line through Dilapidated and Scavenger without even changing the track plan as it is currently laid. more to come...


Edited by - kyle creel on 02/27/2021 09:51:57 AM

Country: USA | Posts: 477 Go to Top of Page

kyle creel
Engine Wiper



Posted - 03/11/2021 :  09:58:10 AM  Show Profile  Reply with Quote
Well fellas, after much consideration and deliberation, along with some friends persuasive oration, I've decided against changing the layout. I shall keep it the way it is and proceed with finishing up the canyon, Mt.Wilson and the turntable at Blackrock. Next there will be more trees and finishing the new bldgs. at Ft.Compton. Also there's still the tunnel portal, oil and gas transfer area,.... so I guess I've got plenty to do this year. (maybe changing the layout wasn't such a great idea after all!)


Country: USA | Posts: 477 Go to Top of Page

Philip
Fireman



Posted - 03/11/2021 :  2:08:32 PM  Show Profile  Visit Philip's Homepage  Reply with Quote


Good choice.



Country: USA | Posts: 3494 Go to Top of Page

Larryc
Crew Chief



Posted - 03/13/2021 :  11:25:22 AM  Show Profile  Reply with Quote
Kyle wise choice NOT changing your layout. Love the duel gauge; adds tons of interest to the area. Nicely done!!


Country: USA | Posts: 890 Go to Top of Page

Rick
Administrator

Premium Member


Posted - 03/13/2021 :  7:32:24 PM  Show Profile  Reply with Quote
Sounds good to me.


Country: USA | Posts: 24510 Go to Top of Page
Page: of 11 Previous Topic: J.D.s Machine Shop Topic Next Topic: R. T. HARDING MINING CO.  
 New Topic |   New Poll New Poll |   Reply to Topic | 
Previous Page | Next Page
Jump To:
Railroad Line Forums © 2000-2020 Railroad Line Co. Go To Top Of Page
Steam was generated in 0.41 seconds. Powered By: Snitz Forums 2000